At the bi-monthly Board of Directors meeting held on May 17, 2025, the Board provided an update on the pool and gate. These were captured in the meeting minutes; however, we are providing some additional details here. There was a time following Hurricane Milton when the pool pumps were not working. This was determined to be due to an error on the part of the installers. These issues have been or are being taken care of; however, during that time, sand became embedded in the curing plastert of the pool, giving it a stained appearance. The pool company attempted to use a pumice process to get rid of the stains, and while it helped, it was not fully successful. As such, the pool company must drain the pool and use an acid wash to get rid of the stains completely. This will take 3 – 6 days to complete. If you see that the pool has been drained or hear about it, this is why it is being drained. This should not delay the opening of the pool as we are waiting for the gate to be completed, and the pool should be done before the gate is completed.